Now showing 1 - 3 of 3
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Optimization-Based Train Timetables Generation with Demand Forecasting for Thailand High Speed Rail System
    In this paper, we propose a timetable optimizer (TO) consisting of the following parts: 1) Demand Forecasting Module 2) Train Optimization Module 3) Timetable Generator Module. TO is a specialized system for planning the train timetable which designed to help solve the problem of determining the number of trains that are suitable and scheduling the train suitably according to the number of trains designated by the system. TO integrates the passenger data from the latest round trip or historical information and forecasts a number of passengers of high-speed trains based on historical data in order to find the optimal number of trains by using a mixed integer programing model. Lastly, the TO system can applies the number of trains to calculate the appropriate train schedule so that the planning cycle is complete. A case study of high-speed railway system in Thailand with 36 trains to satisfy demand of 35,000 passengers/ each direction is conducted. The results show that the proposed system can quickly generate a timetable having an optimal number of train with suitable time interval according to a demand forecasting.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Navigating online learning challenges and educational infrastructure in times of crisis: Insights and solutions among Thai engineering students utilizing a mixed-methods analysis
    The rapid shift to online learning during COVID-19 posed challenges for students. This investigation explored these hurdles and suggested effective solutions using mixed methods. By combining a literature review, interviews, surveys, and the analytic hierarchy process (AHP), the study identified five key challenges: lack of practical experience, disruptions in learning environments, condensed assessments, technology and financial constraints, and health and mental well-being concerns. Notably, it found differences in priorities among students across academic years. Freshmen struggled with the absence of hands-on courses, sophomores with workload demands, and upperclassmen with mental health challenges. The research also discussed preferred strategies for resolution, emphasizing independent learning methods, managing distractions, and adjusting assessments. By providing tailored insights, this study aimed to enhance online learning. Governments and universities should support practical work, prioritize student well-being, improve digital infrastructure, adapt assessments, foster innovation, and ensure resilience.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    A Study on High-Speed Rail Pricing Strategy for Thailand Based on Dynamic Optimal Pricing Model
    The Bangkok–Nong Khai high-speed railway is the first high-speed line in Thailand and is currently under construction. The project is due to be completed by 2023, with ticket prices starting at 80 baht plus 1.8 baht per km which can be considered as a straight-line fare set with a fixed rate increase. Different from the current price policy, this paper examines the application of dynamic pricing to Thailand’s HSR. Dynamic Pricing Optimizer proposed in this paper is a unique system of dynamic pricing by considering the changes in the amount of service requirements and the time of purchasing tickets designed to solve the problem of pricing that is appropriate. First, The Dynamic Pricing Optimizer (DPO) system will integrate the user data from the latest trip or historical information. After that, there will be a forecast for users of high-speed trains based on historical data in order to create a demand function that is linear. After that, the price will be determined by the optimization method to find the most suitable price in order to maximize the revenue. Lastly, we compare both fare policies and found that The Dynamic Pricing policy can increase revenue up to 6.5%.