Repository logo
Communities & Collections
Research Outputs
Fundings & Projects
People
Statistics
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. KMITL
  3. Publication
  4. Simulation-Based Headway Optimization for the Bangkok Airport Railway System under Uncertainty
Loading...
Thumbnail Image

Simulation-Based Headway Optimization for the Bangkok Airport Railway System under Uncertainty

Author(s)
Sasithong, Pruk
Parnianifard, Amir
Sinpan, Nitinun
Poomrittigul, Suvit
Saadi, Muhammad
Wuttisittikulkij, Lunchakorn
Date Issued
August 1, 2023
Type
Article
DOI
10.3390/electronics12163493
Abstract
The ever-increasing demand for intercity travel, as well as competition among all modes of transportation, is an unavoidable reality that today’s urban rail transit system must deal with. To meet this problem, urban railway companies must try to make better use of their existing plans and resources. Analytical approaches or simulation modeling can be used to develop or change a rail schedule to reflect the appropriate passenger demand. However, in the case of complex railway networks with several interlocking zones, analytical methods frequently have drawbacks. The goal of this article is to create a new simulation-based optimization model for the Bangkok railway system that takes into account the real assumptions and requirements in the railway system, such as uncertainty. The common particle swarm optimization (PSO) technique is combined with the developed simulation model to optimize the headways for each period in each day. Two different objective functions are incorporated into the models to consider both customer satisfaction by reducing the average waiting time and railway management satisfaction by reducing needed energy usage (e.g., reducing operating trains). The results obtained using a real dataset from the Bangkok railway system demonstrate that the simulation-based optimization approach for robust train service timetable scheduling, which incorporates both passenger waiting times and the number of operating trains as equally important objectives, successfully achieved an average waiting time of 11.02 min (with a standard deviation of 1.65 min) across all time intervals.
Citation
Electronics Switzerland, 12(16), 2023
Subjects

particle swarm optimi...

railway system

simulation-based mode...

timetable scheduling

uncertainty

Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback