Repository logo
Communities & Collections
Research Outputs
Fundings & Projects
People
Statistics
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. KMITL
  3. Publication
  4. Portable Modular Pool Prototyping for Military Training and Testing in Remote Environment
Loading...
Thumbnail Image

Portable Modular Pool Prototyping for Military Training and Testing in Remote Environment

Author(s)
Yaman, Rostam
Ismail, Farrah Zuhaira
Aziz, Ali Zakafri Ab
Ariff, Nor Rima Muhamad
Kaliwon, Julaida
Aris, Nurul Nabilah
Ahmad, Noraini
Nanta, Piyarat
Date Issued
October 31, 2023
Type
Article
DOI
10.30880/ijscet.2023.14.05.018
Abstract
Military training and periodical assessment are essential in preparing a well-built soldier physically and mentally for the Malaysian Army Forces. One of them is the water survival training test. The test consists of a series of aquatic tasks conducted in a remote area. As a matter of fact, it requires a water-pool facility which is durable and portable. Therefore, this research aims to design and prototype a modular portable swimming pool for floating exercises and assessment for military personnel. The study is conducted in partnership with the Royal Army Engineers Regiment, with the objectives being to design, simulate, prototype, and build the modular portable swimming pool for military uses. The study output was tested, evaluated, and appraised on the swimming pool workability on site. The methodology is divided into 4 phases; (i) Content Studies and Design Profiling, (ii) Digital Prototyping, Evaluation and Testing, (iii) Physical Prototyping-Materials and Method; and (iv) Application and Measurement. The study seeks to maximise the training of military personnel and reduce the transportation time and resource costs of building a permanent pool by placing it with a modular portable swimming pool, which is more cost-efficient and user-friendly. The findings of Phase 1 prototyping required improvement on design structure where it indicated disadvantages in sustaining water volume ability at targeted level due to structural integrity. Upon improvement of Phase 2 prototyping using metal with bracing frame the pool are able to sustain the desired water volume at 5200 l3. Moreover, this study, also responds to the approaches of the Sustainable Development Goals (SDGs) 9, 16 and 17 towards harmonizing and interconnecting the three core elements of sustainability, economic growth, social inclusion, and environmental protection for human well-being.
Citation
International Journal of Sustainable Construction Engineering and Technology, 14(5 Special Issue), 234-240, 2023
Subjects

military training

Mobile modular pool

prototyping

remote environment

Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback