Loading...
Hydropower plant generator system
Author(s)
Date Issued
June 8, 2018
Type
Conference Paper
Abstract
This paper presents the hydropower plant generator system. The hydropower plant model which simulates the actual flow rates is investigated, and it is realized as the Simulink model. The parameters of the permanent magnet synchronous generator are measured and the generator torque characteristic using the obtained parameters is calculated. The hydropower plant torque characteristic and the range of the flow rate in which the hydropower plant generator system can operate is clarified by comparing with hydropower plant Pelton type and hydropower plant Standard type.
Citation
2018 3rd International Conference on Control and Robotics Engineering Iccre 2018, 160-164, 2018
