Repository logo
Communities & Collections
Research Outputs
Fundings & Projects
People
Statistics
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. KMITL
  3. Publication
  4. A Study of Efficiency and Economic Value of Grade Separated Construction Project: Case Study of Grade Separated Without Ramp across The Sri Ayutthaya Intersection Bangkok
Loading...
Thumbnail Image

A Study of Efficiency and Economic Value of Grade Separated Construction Project: Case Study of Grade Separated Without Ramp across The Sri Ayutthaya Intersection Bangkok

Author(s)
Bilee, Rachata
Pitaksringkarn, Jumrus
Date Issued
January 1, 2024
Type
Article
DOI
10.55003/ETH.410107
Abstract
This research was conducted to analyze the efficiency and economic value of grade separated construction projects in a large city due to heavy traffic volumes. This is consistent with the current situation where traffic volumes are continually increasing. In order to reduce fuel consumption, accidents and travel time. In this research, the efficiency and economic value of grade separated without ramp across Sri Ayutthaya intersection will be studied, Bangkok (Thailand), is considered in the form of an underpass through the intersection by using the VISSIM program to create and develop micro simulation traffic models. Then, the economic cost-benefit analysis of the project is evaluated by considering the economic worthiness of the project from a comparison between the case with the project and without the project. The economic worthiness of the project is analyzed by using Net Present Value (NPV), Benefit-Cost Ratio (B/C ratio) and Internal Rate of Return (IRR). From the results of this study, it was found that after developing the current area, which is a ground level intersection into an underpass. Traffic at intersections will be more efficient. And helps reduce traffic congestion at intersections. This is because the average delay of each type of vehicle decreased after the project. Performance measures at intersections can be summarized as the average vehicle delay in the project start year (2027) for motorcycles decreased from 364.48 seconds/vehicle to 85.93 seconds/vehicle, passenger cars decreased from 369.35 seconds/vehicle to 78.42 seconds/vehicle, trucks decreased from 282.19 seconds/vehicle to 78.96 seconds/vehicle, and buses decreased from 420.47 seconds/vehicle to 65.07 seconds/vehicle. And it can be concluded that the project of grade separated construction in the form of an underpass across Sri Ayutthaya Intersection. It is economically worthwhile and suitable for investment. Because the net present value (NPV) in the 15th year of the project (2041) is equal to 1,752.18 million baht, which is greater than 0, the benefits-costs ratio (B/C Ratio) in the 15th year of the project (2041) is equal to 3.61, which is greater than 1, and the internal rate of return (IRR) at the 15th year of the project (2041) is equal to 42%, which is greater than 12%.
Citation
Engineering and Technology Horizons, 41(1), 2024
Subjects

Economic Value

Grade Separated

Micro Simulation Mode...

Performance Measureme...

The Sri Ayutthaya Int...

Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback