Impact on Protective Device Sequence of Operation in Case Distributed Generation Integrated to Distribution System

dc.contributor.authorIssarachai Ngamroo
dc.contributor.authorWikorn Kotesakha
dc.contributor.authorSuntiti Yoomak
dc.contributor.authorAnantawat Kunakorn
dc.date.accessioned2025-07-21T06:09:34Z
dc.date.issued2023-07-07
dc.description.abstractThis study aims to evaluate the impact of the distributed generator (DG) connection to the grid. The simulated results present the parameters of the system required to install DG on the end of the main distribution feeder. Various parameters, such as voltage, current, and protective relay coordination are modelled after the actual provincial electricity authority (PEA) distribution system. Various case studies compared the coordination without and with DG connections to the grid by finding the difference of protective devices. The results indicate that the malfunction can be fixed in order of priority protective devices, which operate according to the parameter setting. Additionally, the coordinate functions between the recloser and fuse devices in both phase and ground configurations in the operating zone prevented the drop-out fuse melting or burning out. Based on the result, this problem is fixed by providing a directional recloser device and increasing the fuse-link rated with 40k installation for replacing the conventional sizing, which can improve the performance in case of fault occurrence to investigate the reliability and stability of the distribution system.
dc.identifier.doi10.3390/app13137970
dc.identifier.urihttps://dspace.kmitl.ac.th/handle/123456789/12645
dc.subjectRecloser
dc.subjectFuse (electrical)
dc.subject.classificationIslanding Detection in Power Systems
dc.titleImpact on Protective Device Sequence of Operation in Case Distributed Generation Integrated to Distribution System
dc.typeArticle

Files

Collections