Publication:
Integrating m-Machine scheduling into MRP

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Research Projects

Organizational Units

Journal Issue

Abstract

This paper presents an approach to integrate the m-machine production scheduling into Material Requirements Planning (MRP). In general, generating MRP considers only Bill of Materials (BOM) and ignores capacity constraints and operating sequences; therefore, a production plan is unachievable when scheduling is actually performed next on shop-floor. That is why recent research has focused on executing both MRP and scheduling simultaneously. Our approach uses an integer linear programming model to plan and schedule concurrently to look right through the capacity constraints and operating sequences. The objective function of the proposed model considers both planning and scheduling purposes that is to minimize total inventory costs and order's tardiness. All significant and inevitable concerns when separately generating MRP and schedule are incorporated with the model through several constraints. Numerical results show that this model can be used to simultaneously generate reasonable MRP as well as feasible and optimal m-machine production schedule. © 2009 IEEE.

Description

Keywords

Advanced Planning and Scheduling (APS), Bill of Material (BOM), Integer linear programming model, Material Requirements Planning (MRP)

Citation

2009 4th International Conference on Innovative Computing Information and Control Icicic 2009, 1365-1368, 2009

Collections

Endorsement

Review

Supplemented By

Referenced By